Back from Manchester, still a bit buzzed from Wednesday's session.
"One Logic, Two Labels" came out of something I noticed while writing about S-DBR a few weeks ago, but had never said out loud to a room before: CCPM and Simplified Drum-Buffer-Rope aren't two different tools. They're the same logic, applied to two different worlds.
Protect the one thing that decides whether you deliver on time. Buffer it. Subordinate everything else to it. Manage by buffer status, not by chasing the loudest fire.
I showed the room a production diagram, then asked them to read it again after swapping "work centre" for "task". Same diagram. Suddenly it's a project plan, not a production line.
That's the connection that got me the invitation in the first place — it started as one paragraph in this article (https://www.menicucciassociati.com/s-dbr-manufacturing-toc/), and TOCICO reached out not long after it went up.
Two days with people who've been doing this far longer than me, and somehow my session held its own. Thank you again to TOCICO for having me, and to everyone who stopped to talk afterwards — that's usually where the real conversation happens anyway 🤗


If you're not sure where you're standing — production or project — the deck below walks through both. And if you want to talk through where your own constraint actually sits, that's usually a better use of your time than another slide.
Happy to talk it through — no pitch attached.